PROJECT DESCRIPTION
The project included the mulching and removing vegetation and trees, construction of an access road down a steep grade to a swale drain and large culvert, installation of Drainage back flow devices to Princess Highway and Kanahooka Road drainage systems, construction of a Concrete and Turf swale drain and installation of a pedestrian fence.
The in-accessibility to the project and construction of Swale drain over an Jemena asset (High pressure gas main) was the biggest challenge to the project. Traffic and Pedestrian management were required among the whole period of the Project.
PROJECT DETAIL
- Client: Wollongong City Council
- Date Completed: June 2019